Project title: The Capacity Development Project for Management of Water Environment
(Phase II) (The Third Year)
Period of site survey: May 5, 2009 to March 31, 2010
Client: Japan International Cooperation Agency (JICA)
Project title: Environemntal and Social Consideration Study on the Project for Construction
of Thermal Power Station in Thai Binh Province
Period of site survey: May 17 to May 23, 2009
Client: Japan International Cooperation Agency (JICA)
Project title: The Technical Cooperation Project for Strengthening of Water Examination
System (The First Year)
Period of site survey: March 18 to September 14, 2009
Client: Japan Internatioanl Cooperation Agency (JICA)
Project titile: Dispatch of Regional Project Formulation Advisor (Water Supply) to Regional
Support Office for JICA
Period of site survey: March 3, 2009 to March 2, 2010
Client: Japan International Cooperation Agency (JICA)
Project title: Preparatory Study on the Project for Improvemnt of Water Supply in Khulna
Period of site survey: February 6 to February 25, 2009
Client: Japan International Cooperation Agency (JICA)
Project title: Detailed Planning Study on the Project for Water Service Improvemnt
in Maminasata Metropolitan Area in South Sulawesi Province
Period of site survey: January 25 to March 7, 2009
Client: Japan International Cooperation Agency (JICA)




Project title: Dispatch of Expert (Project Evaluation) to the Bach Mai Hospital Project
for Strengthening Training Cpacity for Provincial Hospitals
Period of site survey: August 30 to September 19, 2009
Client: Japan International Cooperation Agency (JICA)
VIET NAM
Project title: Preparatory Study on the Project for the Development of Irrigation Area
in Podor
Period of site survey: August 10 to September 9, 2009
Client: Japan International Cooperation Agency (JICA)
SENEGAL
Project records in 2009
The ancient city of Petra built from 800BC to 100AD by the Nabetean Arabs
BANGLADESH
Project title: The Technical Cooperation Project for Strengthening of Water Examination
System (The Second Year)
Period of site survey: October 16, 2009 to June 30, 2010
Client: Japan International Cooperation Agency (JICA)
TOGO
NEPAL
JORDAN
Projcct title: Preparatory Study on the Project for Rural Water Supply Development
in Maritine, Plateaux and Savanes Regions
Period of site survey: October 24 to November 28, 2009
Client: Japan International Cooperation Agency (JICA)
Project title: Detailed Planning Study on Master Plan Development Study for Nationwide
Hydraulic Power Station with Reservoir
Period of site survey: November 1 to November 22, 2009
Client: Japan International Cooperation Agency (JICA)
Project title: Preparatory Study on the Project for Water Supply Improvemnt in Southern
Region
Period of site survey: October 9 to November 6, 2009
Client: Japan International Cooperation Agency (JICA)
Sombo Opu WTP with a capacity of 86,400 m3/day in Kota Makassarr constructed
in 2001 by Yen-loan and having an extension plan
Bejen WTP wiht a capacity of 1,080 m3/day in Kabpaen Gowa constructed in
2002 by Japan grant aid program
INDONESIA
Project title: JICA Water Supply Program Formulation Study
Period of site survey: July 26 to August 8, 2009
Client: Japan International Cooperation Agency (JICA)