WELCOME TO OUR COMPANY
HOMEPROFILESSERVICESNEW INFOCONTACT
ライン
UGANDA
Project title: Preparatory Study on Water Resources Developement and Managemnt in Lake-Choga Basin
Period of site survey: August 31 to September 29, 2008
Client: Japan International Cooperation Agency (JICA)
Project title: Peparatory Study on the Project for Enhancement of Economic Circulation
Period of site survey: March 23 to March 29, 2008
Client: Japan International Cooperation Agency (JICA)

Project titile: Cooperation Program/Project Fourmulation Study on Water Supply and Sanitation Sector
Period of site survey: March 12 to April 10, 2008
Client: Japan International; Cooperation Agency (JICA)

Project title: Project Formulation Study for Urban Transportation of Dhaka City
Period of site survey: March 1 to March 15, 2008
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on the Project for Advancing NRW Reduction Initiative of Chittagong WASA
Period of site survey: January 11 to February 9, 2008
Client: Japan International Cooperation Agency (JICA)
CHINA




PERU




BANGLADESH



BANGLADESH
EGYPT




VIET NAM




TIMOR-LESTE
Project titile: Preliminary Study on the Project for Water Supply Development in Itay El Barud Markas, Beheira Governorate
Period of site survey: May 26 to June 27, 2008
Client: Japan International Cooperation Agency (JICA)

Project title: The Capacity Development Project for Management of Water Environment (Phase II)(The Second Year)
Period of site survey: April 28, 2008 to March 31, 2009
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on the Capacity Development Project for Water Supply System in Dili
Period of site survey: April 6 to April 25, 2008
Client: Japan International Cooperation Agency (JICA)
EL SALVADOR
Project title: Preliminary Study on the Project for Improvement of Water Supply in Abbottabad City
Period of site survey: September 5 to October 2, 2008
Client: Japan International Cooperation Agency (JICA)
PAKISTAN
SYRIA



TURKEY



SRI LANKA




MALAWI
Benamauk WTP in Dili constructed by Japanese grant aid program with a capacity of 600 m3/day
Children gathering at the public taps provided by Japanese grant aid program in Ainaro, mountain area
Project title: Preparatory Study on the Techical Cooperation Proejct for Capacity Development for Operational Improvement of ANDA
Period of site survey: June 28 to July 18, 2008
Client: Japan International Cooperation Agency (JICA)
Return to NEW INFO
INDIA
Project title: The Study on Improvement of Water Supply System in Delhi
Period of site survey: August 18 to November 11, 2008
Client: Japan International Cooperation Agency (JICA)
Aeration shelves and sedimentaion pond for iron removal in Kalurgat WTP
View of crowded streets where many rikishas are running.
Project records in 2008
A small-scale waste water treatment plant in the residencial estate in San Salvador operated and maintained by ANDA
A conrol room in the ANDA's water distribution control center in San Salvador Metropolitan Area
A map of water districts by water dsistribution pumping station in Delhi
A rapid coagulation settling tank in Haiderpur WTP whihc is the largest WTP in Delhi with a capaicty of 900,000 m3/day
Projcct title: Cooperation Peparatory Study on Water Sector
Period of site survey: November 8 to December 4, 2008
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on Power Optimization Project
Period of site survey: November 9 to November 30, 2008
Client: Japan International Cooperation Agency (JICA)

Project title: Fact-finding Study on Capacity Development of Non Revenue Water (NRW) Reduction in Colombo City
Period of site survey: November 5 to November 22, 2008
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on the Urban Development Mater Plan for Lilongwe
Period of site survey: November 1 to November 29, 2008
Client: Japan Internatioanl Cooperation Agency (JICA
VIET NAM
Project title: The Capacity Development Project for Management of Water Environment (Phase II)(The First Year)
Period of site survey: December 26, 2007 to March 31, 2008
Client: Japan Internatioanl Cooperation Agency (JICA)
ライン