ETHIOPIA




NIGER




SOLOMON
ISLANDS



PHILIPPINES




BURKINA FASO





VIET NAM





CHILI




PAKISTAN





MAURITANIA




TAJIKISTAN
Project title: Preliminary Study on the Project for Rural Water Supply in Oromia State in Federal Democratic Republic of Ethiopia
Period of site survey: August 11 to September 20, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preliminary Study on the Project for Rural Water Supply for Guinea-warm Extermination in Tillaberi State in the Republic of Niger
Period of site survey: August 6 to September 6, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preliminary Study on the Project for Improvement of Urban Water Supply System in the Capital and Major Lodal Cities in Solomon Islands
Period of site survey: July 24 to August 23, 2007
Client: Japan International Cooperation Agency (JICA)


Project title: Preparatory Study for the Improvement of Water Supply and Sanitation in Metro Cebu in the Republic of Philippines
Period of site survey: July 18 to August 7, 2007
Client: Japan International Cooperation Agency (JICA)


Project title: Pepratory Study on the Capacity Building Project for Management of Water Supply Facilities in the Central Plateau and Central-south Region in Burkina Faso
Period of site survey: July 8 to August 2, 2007
Client: Japan International Cooperation Agency (JICA)


Project title: Terminal Evaluation of the Project for Capacity Building of Institute of Food Industry in Viet Num
Period of site survey: May 1 to May 18, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on the Technical Cooperation Project for Administrative Capacity Building for Enhancement of Environmental Education
Period of site survey: March 11 to March 26, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preliminary Study on the Project for Improvement of Drinking Water Supply in Kohat and Karak Districts of North West Frontier Province in Islamic Republic of Pakistan
Period of site survey: February 25 to March 29, 2007
Client: Japan International Cooperation Agency (JICA)


Project title: Preparatory Study on the Project for Potabale Water Supply in Adrar and Tagant Region in the Islamic Republic of Mauritania
Period of site survey: January 20 to March 10, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: The Preparatory Study on the Study for Sustainable Rural Water Supply System in the Southern Khatlon Oblast in the Republic of Tajikistan
period of site survey: January 23 to February 28, 2007
Client: Japan International Cooperation Agency (JICA)
Project title: Preparatory Study on Groundwater Environment for Remediation of Ecosystem and Prevention of Desertification on Suyang River Basin in Guanzu Province, China
Period of site survey: October 31 to November 24, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preparatory Study on the Technical Cooperation Project for Management of Pollution Sources on Santa Lucia River Basin in the Oriental Republic of Urguay
Period of site survey: October 28 to November 16, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Dispatch of Short-term Expert for the Capacity Building Project for Training of the Local Medical Human Resources in Back-Mai Hospital in Viet Num
Period of site survey: October 18 to November 3, 2007
Client: Japan International Cooperation Agency (JICA)

Project title: Preliminary Study on the Project for Construction of San Juan Water Treatment Plant in Potosi City in the Republic of Bolivia
Period of site survey: October 10 to November 8, 2007
Client: Japan International Cooperation Agency (JICA)
WELCOME TO OUR COMPANY
HOMEPROFILESSERVICESNEW INFOCONTACT
ライン
View of Potosi city where is located in the heighest altitude (4,000 m) all over the world
CHINA





URUGUAY





VIET NAM




BOLIVIA
Childred fetching drinking water from the pond by donkey and biycle
The obsolete Vakhsh pipeline constructed in 1976 (made of steel with dia. 900mm)
 Conduit pipes transferring water from San Juan river to Potosi city (Dia.: 400〜500 mm, Total length: 51km)
ライン

Project records in 2007
Return to NEW INFO